aa.
All writing
  • QA
  • UAT
  • Templates
  • Release Management

UAT Test Plan: Free Template, Example and Sign-Off

How to write a UAT test plan: the sections it needs, a filled-in example, entry and exit criteria, sign-off wording, and a free Excel UAT test plan template.

· 10 min read

A tilted glowing amber page with a checklist, the top items filled in and the last ones still open, a bright seal at the bottom, and three lines leading to small cards on the right

UAT goes wrong in predictable ways: the client tests unfinished work, feedback arrives in five different chats, nobody agreed what "done" means, and the testing window quietly stretches by another week. A short UAT test plan prevents most of that, because everyone agrees the rules before testing starts.

This guide is for project managers, QA leads and developers who run user acceptance testing with a client or business users. It covers what a UAT test plan includes, a filled-in example, entry and exit criteria, sign-off wording, and a free Excel UAT test plan template. If you're new to UAT itself, start with What Is UAT?.

The short answer

A UAT test plan is a short document that says what the users will test, who tests it, where and when, how issues are reported and sorted, and what has to be true to sign off. It's agreed with the client before UAT starts. One or two pages is usually enough. The test cases and the issue log live in a spreadsheet next to it.

What is a UAT test plan?

The ISTQB glossary defines a test plan as documentation that describes the test objectives, and the means and schedule for achieving them. A UAT test plan applies that to one specific test level: acceptance by the people who will use the software.

The difference from a QA test plan is the audience. A QA test plan is written for testers and covers how the team will check the software against the requirements. A UAT test plan is written for the client. It has to be readable by people who aren't testers, and it ends with a business decision: accept the release, or don't.

What to include in a UAT test plan

Section What goes in it Why it matters
1. Release and version Project, release name, build number, plan owner Everyone tests and signs off the same build
2. Objective and scope What this round must prove; features and user stories in scope and out of scope Stops testing of unfinished or unrelated work
3. Testers and roles Who tests which areas, who triages, who fixes, who signs off Sign-off has one named owner
4. Environment and test data UAT URL, test accounts, sample data, devices and browsers Testers don't lose day one to access problems
5. Entry criteria What must be true before UAT starts Clients only see QA-passed work
6. Test scenarios Real tasks in the user's language, with expected results Tests business fit, not code
7. Issue handling Where to report, severity levels, defect vs change request Feedback goes to one place and gets sorted
8. Schedule Dates for testing, fixing, retesting and sign-off UAT has an end date
9. Exit criteria and sign-off What must be true to finish, and who signs "Done" is agreed before anyone argues about it

That's the whole plan. If a section doesn't apply, write "not applicable" rather than deleting it, so it's clear the question was considered.

UAT test plan example

Here's a filled-in plan for one release of a fictional web app: a timesheet and payroll export feature. Your plan will have different content, but the shape is the same.

Section Example
Release Timesheets v2.3, build 2.3.0-rc2. Plan owner: project manager
Objective Confirm managers can review, approve and export monthly timesheets for payroll
In scope Timesheet approval, monthly export to Excel, overtime rules
Out of scope Mobile app, leave requests (next release), report styling
Testers Two team managers (approval and export), one payroll admin (overtime and export file). Sign-off: client's operations lead
Environment Pre-production URL, one test account per tester, anonymised copy of last month's data
Entry criteria QA passed, no open critical bugs, test accounts working, scenarios shared
Issue handling All feedback in the shared issue log. Blocker / Major / Minor / Cosmetic. Each item marked defect, change request or question
Schedule Testing Mon–Wed of week 1, fixes Thu–Fri, retest Mon–Tue of week 2, sign-off Wed
Exit criteria All scenarios run; no open Blocker or Major defects; Minor issues listed and accepted; change requests logged separately
Sign-off Operations lead signs in writing for build 2.3.0-rc2, listing any accepted known issues

Notice the schedule has a retest round built in. Without it, the fixes from round one either go untested or push the release date.

Entry and exit criteria for UAT

Entry criteria protect the client's time. Before UAT starts:

Exit criteria define the end. A common set:

If the exit criteria aren't met by the end date, that's a decision for the client and the project manager: extend UAT, release with accepted known issues, or move the release. The plan doesn't make that decision, but it makes sure it's made openly.

UAT test cases: write scenarios, not steps

A UAT test case should read like a task the user does at work, not a technical check:

ID Scenario Expected result
UAT-01 A manager approves all timesheets for their team for last month Every timesheet shows "Approved", with the manager's name and date
UAT-02 A payroll admin exports approved timesheets to Excel The file contains every approved timesheet, and totals match the screen
UAT-03 A manager rejects a timesheet with a comment The employee sees the rejection and the comment

Each case should trace back to a user story and its acceptance criteria. If you write those well, the UAT scenarios almost write themselves; I explain how in How to Write User Stories and Acceptance Criteria. There's a fuller single test case example, with steps and result fields, in What Is UAT?.

Triage every issue: defect, change request or question

The most useful rule in a UAT plan is that every piece of feedback gets a type before anyone starts fixing it:

  • Defect: the software doesn't meet the agreed acceptance criteria. It gets fixed and retested.
  • Change request: the request is new or different from what was agreed. It gets estimated and planned; it isn't slipped into the release.
  • Question: the tester wasn't sure how something should work. Answer it, and update the documentation if others will ask too.

And every defect gets a severity:

Severity Meaning Usual rule
Blocker A key scenario can't be completed, with no workaround Must be fixed before sign-off
Major A key scenario works incorrectly or needs a painful workaround Must be fixed before sign-off
Minor Works, with a small problem Fix now or accept as a known issue
Cosmetic Visual only Usually accepted and scheduled

Agree the rules in the plan, before testing. Arguing about whether something is a bug or a new feature is much harder once the release date is close.

UAT sign-off

Sign-off closes UAT. A useful sign-off records:

  • the build or version that was accepted,
  • the scenarios that were tested,
  • any known issues the client accepts for this release,
  • the decision: accepted, accepted with known issues, or not accepted,
  • who signed, their role, and the date.

A short sign-off message can be as simple as:

We have completed UAT for Timesheets v2.3 (build 2.3.0-rc2). All planned scenarios were tested. We accept this release for production, with the two known minor issues listed in the issue log (UAT-I-07, UAT-I-11).

Written sign-off matters more than the format. An email or a signed sheet is fine; "they said it looked fine on the call" isn't.

How to write a UAT test plan in 6 steps

  1. Start from the release scope. List the user stories in this release, and what's explicitly out.
  2. Name the people. Testers by area, one person who triages, and one person who signs off.
  3. Write the scenarios from the acceptance criteria, in the user's language.
  4. Agree entry and exit criteria, including the severity rules.
  5. Set the dates, including a retest round and the sign-off date.
  6. Review it with the client before UAT starts, and share it in one place.

Common UAT planning mistakes

  • No out-of-scope list. Testers will test what they see, including work that isn't ready.
  • No retest round. Fixes from the first round either go untested or delay the release.
  • No single sign-off owner. Three people "approving" means nobody can say no.
  • Feedback in chats and calls. If it isn't in the issue log, it can't be tracked or triaged.
  • Treating every comment as a defect. New ideas are welcome, but they're change requests with their own estimate.

Free UAT test plan template (Excel)

Download the UAT test plan template (.xlsx) · Preview what's inside

It includes:

  • a UAT plan sheet with all nine sections, entry and exit criteria checklists, and the example above to edit,
  • a Test cases sheet with Pass / Fail / Blocked / Not run dropdowns,
  • an Issue log with type (defect, change request, question), severity and status,
  • a Summary & sign-off sheet that counts results and open issues automatically, checks the exit criteria, and has a sign-off block.

It works in Excel and in Google Sheets (File → Import → Upload).

Frequently asked questions

Who writes the UAT test plan?

Usually the project manager or the QA lead, with input from the client. The project manager owns the scope, schedule and sign-off; QA helps with scenarios, environment and test data; the client confirms the scenarios reflect real work. The client should review and agree the plan before UAT starts.

What is the difference between a test plan and a UAT test plan?

A test plan describes the objectives, approach and schedule for any testing. A QA test plan is written for testers and checks the software against the requirements. A UAT test plan is written for the client or business users, uses business scenarios, and ends with a decision to accept the release or not.

What are entry and exit criteria in UAT?

Entry criteria are the conditions that must be true before UAT starts, such as QA passed and test accounts working. Exit criteria are the conditions for finishing, such as all scenarios run, no open Blocker or Major defects, and written sign-off. Both are agreed in the UAT test plan before testing begins.

How long should UAT take?

It depends on the size of the release and how much time the testers have. What matters more is that the window is fixed and agreed in advance, and includes a retest round after fixes. An open-ended UAT window is one of the most common reasons releases slip.

What comes first, UAT or QA?

QA comes first. QA checks that the software works against the requirements; UAT checks that it meets the users' needs. If clients find basic bugs during UAT, QA came too late or the entry criteria weren't checked.

Final thoughts

A UAT test plan isn't paperwork for its own sake. It's the agreement that lets the client test with confidence and lets the team finish: what's being tested, who decides, and what "accepted" means, written down before anyone needs to argue about it.

Related: What Is UAT? · Definition of Done vs Acceptance Criteria vs Definition of Ready · RACI Matrix for Software Projects